{"id":268092,"date":"2019-09-12T00:00:00","date_gmt":"2019-09-12T07:00:00","guid":{"rendered":"https:\/\/sdnews.com\/residents-waiting-and-waiting-for-bermuda-avenue-beach-access-repairs\/"},"modified":"2019-09-12T00:00:00","modified_gmt":"2019-09-12T07:00:00","slug":"residents-waiting-and-waiting-for-bermuda-avenue-beach-access-repairs","status":"publish","type":"post","link":"https:\/\/test.sdnews.com\/es\/residents-waiting-and-waiting-for-bermuda-avenue-beach-access-repairs\/","title":{"rendered":"Residents waiting, and waiting, for Bermuda Avenue beach access repairs"},"content":{"rendered":"<p>Ocean Beach residents are becoming increasingly restive about proposed stairway and seawall repairs to restore Bermuda Avenue coastal access that some feel is long overdue.<br \/>\nThe Bermuda staircase\/seawall, which provides the only access to the pocket beach below, was damaged during winter storms in 2015-16. Subsequently, City staff closed the stairwell due to tidal action that eroded the lower stairway foundation causing the lower stairs to collapse.<br \/>\nThe community was told then by the City that staff was working through the design and environmental process, and that a request had been made for construction funding for the Bermuda repair project from the Regional Park Improvement Fund.\u00a0<br \/>\nBack then, OB was told the project &#8220;should be 100% funded,&#8221; and that a bid and award to a company, as well as construction, would each &#8220;take about three months.&#8221;<br \/>\nThe projected timeline for having the stairway fully reconstructed was determined to be &#8220;late spring of 2018, if not earlier.&#8221;<br \/>\nFast forward to September 2019, and the reconstruction project has yet to begin.<br \/>\n&#8220;I\u2019m one of those people who feel it\u2019s time to get the project started,&#8221; said OB resident Tom Roeber, who lives near the Bermuda stairs. &#8220;I\u2019d like to see at least a temporary fix, simple stairs to get to the platform so people are not crawling down the cliffs and risking getting hurt. All you need is a stairway to go about 12 feet.&#8221;<br \/>\nOB Planning Board member Kevin Hastings, speaking for himself, agreed.<br \/>\n&#8220;They (City) spend years in the design of some of these projects,&#8221; he said. &#8220;When Bermuda (stairwell) collapsed in 2016, they got on it real quick. But it\u2019s still in design.&#8221;<br \/>\n&#8220;The project is currently in the design stage, and we are estimating that construction would begin in the summer of 2021 and finish in the winter of 2021,&#8221; said City spokesman Alec Phillipp. &#8220;However, this is subject to change pending the design and required environmental review.&#8221;\u00a0<br \/>\nThe City has estimated that replacing the existing Bermuda stairway, and either repairing or replacing the existing seawall, would cost $1.5 million, $600,000 for construction.<br \/>\nThe City added the repair project would also &#8220;provide a complete assessment of the factors causing and contributing to the failure of the stairway, with the aim of either repairing or replacing the structure as appropriate.&#8221;\u00a0<br \/>\nThe repair project also includes assessment of the adjacent seawall, given the two structures are connected, and the seawall has been undermined and repaired in the past, the City said.<br \/>\n&#8220;We all know people are going to use it (stairwell), so why not make it at least accessible?&#8221; asked Roeber.<br \/>\n&#8220;If they (City) give me permission, I\u2019ll build it,&#8221; he quipped. &#8220;Hand me a few ladders \u2014 I\u2019ll put them there.&#8221;<br \/>\nIn Hasting\u2019s view, the City\u2019s summer construction moratorium, which forbids coastal construction work between Memorial and Labor days, ought to be waived for repair projects like that needed at Bermuda.\u00a0<br \/>\n&#8220;What the summer moratorium means is that, when they finally get to work on this thing, the king tides and the waves come and you can\u2019t build a beach-access stairwell,&#8221; Hastings said. &#8220;In the wintertime, it\u2019s not gonna happen. They really need to make an exception to the beach moratorium for these things.&#8221;<br \/>\nConcluded Hastings, &#8220;People are getting impatient. It\u2019s gone way too long.&#8221;<\/p>","protected":false},"excerpt":{"rendered":"<p>Ocean Beach residents are becoming increasingly restive about proposed stairway and seawall repairs to restore Bermuda Avenue coastal access that some feel is long overdue. The Bermuda staircase\/seawall, which provides the only access to the pocket beach below, was damaged during winter storms in 2015-16. Subsequently, City staff closed the stairwell due to tidal action [&hellip;]<\/p>","protected":false},"author":726,"featured_media":268093,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"11561","_seopress_titles_title":"Residents waiting, and waiting, for Bermuda Avenue beach access repairs","_seopress_titles_desc":"","_seopress_robots_index":"","jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":[],"footnotes":""},"categories":[11551,11561],"tags":[],"class_list":["post-268092","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-peninsula-beacon"],"_links":{"self":[{"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/posts\/268092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/users\/726"}],"replies":[{"embeddable":true,"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/comments?post=268092"}],"version-history":[{"count":0,"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/posts\/268092\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/media\/268093"}],"wp:attachment":[{"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/media?parent=268092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/categories?post=268092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/test.sdnews.com\/es\/wp-json\/wp\/v2\/tags?post=268092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}