• en_US
  • es_MX
  • Sobre nosotros
martes, diciembre 30, 2025
Sin resultados
Ver todos los resultados

  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Publicaciones
  • Directorio de negocios
  • Sobre nosotros
  • Contáctenos
  • Escritores del personal
  • Suscripciones/Soporte
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Informe de noticias
SDNews.com
Casa Noticias de La Jolla Village

Contractors fighting clock to complete construction along Avenida de la Playa

Tech por tecnología
mayo 2, 2014
en Noticias de La Jolla Village, Noticias
Tiempo de leer: 3 minutos de lectura
0 0
A A
0
Contractors fighting clock to complete construction along Avenida de la Playa
0
COMPARTE
34
PUNTOS DE VISTA
Contractors fighting clock to complete construction along Avenida de la Playa

Contractors are racing against time to complete the so-called Avenida de la Playa Infrastructure Replacement and Sewer & Water Group projects at La Jolla Shores before Memorial Day, ahead of the city’s summer construction moratorium.
“Everyone involved is doing their absolute best to complete the project, making every effort to finish up as quickly as possible,” said Department of Public Works spokeswoman Mónica Muñoz. “But as you know, we can never assume that everything will go smoothly and without a hitch.”
The projects are designed to improve stormwater, sewer and water services by creating more reliable systems and replacing undersize storm drains, which have contributed to frequent flooding and resultant pollution to the adjacent Shores beach and its state-designated Area of Special Biological Significance. They involve installing new sewer and water mains within portions of the public rights-of-way of Avenida de la Playa, Paseo del Ocaso, E1 Paseo Grande, Vallecitos, Calle Frescota, Camino del Sol, Camino del Oro, Paseo Dorado and Avenida de la Ribera.
In a prepared statement, the city said both projects — which have been combined into one and are being done concurrently to save time and cost — is “not on schedule due to delays caused by utilities conflict/relocation, the SDG&E under grounding of power lines and the redesign of box culverts to provide proper street drainage.”
The city said unforeseen construction delays occurred in late February because of a quality-control issue with material from a supplier and in early March, when there were several days of rain.
“The schedule, as often happens with construction, currently is in flux. The recovery schedule may be provided in the next two weeks or so. Due to these delays, an acceleration change has been submitted to the city engineering department for approval,” according to the city’s statement. 
“Everyone is tolerating it (construction) knowing it’s for improvement and has to happen,” said Izzy Tihanyi, of Surf Diva on Avenida de la Playa. He added some work changes have been disconcerting.
“We were told they weren’t going to cut up the avenue and now they are, so we’re (merchants) a little confused,” she said.
Tihanyi said the community and city have been collaborating for thepast couple years to pave the way for project construction, noting the city’s original plan “was to cut up the street for eight months,” after which, she said, “not a single business would have been left in La Jolla Shores.”
Tihanyi stressed that the Memorial Day completion date is a hard target.
“Work has to be done. There’s no leeway. They must be finished,” she said.
The summer season is by far the busiest for most Shores businesses, like kayak operators, who do the lion’s share of their trade between Memorial and Labor days.
And there are a surprising number of Shores’ businesses.
“There are a lot more than you think, more than 120 counting offices,” said Tihanyi, who is a member of the Shores micro-Business Improvement District.
In a community letter, Tim Lucas, chairman of the La Jolla Shores Association community advisory group, answered concerns about the large crane being used at the intersection of Camino del Oro and Avenida de la Playa. 
“This was brought in to facilitate the removal and resetting of the 39 sections of culvert that had previously been installed,” he said. “After the initial installation, it was found that there were potentially serious drainage issues in the event of a really large storm that could affect the adjacent hotel, nearby residents and the Shores business district.”
Lucas said city engineers “made a tough — but the right — decision for our community in opting to redo the installation.”
The good news, said Lucas, is contractors “were able to remove, adjust the trench level and reinstall the culvert in record time using the crane and a lot of focused effort.” 
The bad news, Lucas said, is that “there are a lot of steps that still need to be completed, and in order to finish the project in time for the summer moratorium they will continue to work longer hours, until 7 p.m. and also on Saturdays.”
The city said everyone is keeping their fingers crossed as infrastructure work continues along Avenida de la Playa.
“The unexpected is to be expected with a construction project,” said Muñoz, adding parking problems in the area relating to ongoing construction have been largely resolved.
“HPS Mechanical, the city’s contractor, worked with the manager of a property on Avenida de la Playa and the owner of La Jolla Beach and Tennis Club to secure parking spaces at LJBTC through May 23 for the five residences of Avenida De La Playa who are currently without the use of their garages,” she said.

Publicación anterior

Cuaderno de educación

Publicación siguiente

Resumen de noticias: mayo de 2014

Tech

tecnología

Relacionados Publicaciones

Contractors fighting clock to complete construction along Avenida de la Playa
Beach & Bay Press - Noticias

I Love A Clean San Diego colocará 200 contenedores temporales a lo largo de las playas

por Personal de SDNEWS
26 de mayo de 2023
A red wood gavel
Noticias

Avanza el juicio por asesinato por apuñalamiento en North Park

por Neal Putnam
7 de mayo de 2023
Contractors fighting clock to complete construction along Avenida de la Playa
Beach & Bay Press - Noticias

Figura del asesinato de Garett Berki en 2011 fue encontrada asesinada en una fiesta

por Neal Putnam
4 de mayo de 2023
sdsu housing
Noticias de Mission Valley - Noticias

Seleccionan desarrollador para el primer proyecto de vivienda asequible en SDSU Mission Valley

por Personal de SDNEWS
12 de abril de 2023
balboapark
Noticias del centro

Noticias breves de abril de San Diego y sus alrededores

por Personal de SDNEWS
11 de abril de 2023
Contractors fighting clock to complete construction along Avenida de la Playa
Noticias del centro

Ayuntamiento: El mayor propietario de viviendas de Estados Unidos aumenta el alquiler y desaloja a los inquilinos en SD

por Juri Kim
10 de abril de 2023
Contractors fighting clock to complete construction along Avenida de la Playa
Noticias del centro

Se lanza campaña de seguridad vial con carteles en intersecciones donde fallecieron personas

por Juri Kim
7 de abril de 2023
Contractors fighting clock to complete construction along Avenida de la Playa
Noticias del centro

El capítulo local de “Banking on Our Future” protesta contra los vínculos de los grandes bancos con los combustibles fósiles.

por Juri Kim
5 de abril de 2023
Publicación siguiente
Contractors fighting clock to complete construction along Avenida de la Playa

Resumen de noticias: mayo de 2014

[bloque de inserción = "1"]
  • Directorio de negocios
  • Sobre nosotros
  • Contáctenos
  • Escritores del personal
  • Suscripciones/Soporte
  • Publicaciones
  • Informe de noticias

CONECTAR + COMPARTIR

© Derechos de autor 2023 SDNews.com Política de privacidad

¡Bienvenido de nuevo!

Inicie sesión en su cuenta a continuación

¿Contraseña olvidada?

Recupera tu contraseña

Ingrese su nombre de usuario o dirección de correo electrónico para restablecer su contraseña.

Iniciar sesión
Sin resultados
Ver todos los resultados
  • en_US
  • es_MX
  • Informe de noticias

© Derechos de autor 2023 SDNews.com Política de privacidad