• en_US
  • es_MX
  • Sobre nosotros
viernes, diciembre 19, 2025
Sin resultados
Ver todos los resultados

  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Publicaciones
  • Directorio de negocios
  • Sobre nosotros
  • Contáctenos
  • Escritores del personal
  • Suscripciones/Soporte
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Historias destacadas
  • Noticias
  • Características
  • Opinión
  • Educación
  • Arte y entretenimiento
  • Deportes
  • Directorio de negocios
  • Asesoramiento de expertos
  • Bienes raíces
  • Informe de noticias
SDNews.com
Casa Noticias

Navy pipeline project progressing to completion in 2017

Tech por tecnología
julio 8, 2016
en Noticias, Sin imágenes, Península Beacon
Tiempo de leer: 2 minutos de lectura
0 0
A A
0
0
COMPARTE
8
PUNTOS DE VISTA

The Navy is working hard to minimize traffic disruption caused by the ongoing realignment of a 4.5-mile segment of its existing fuel pipeline from the coast onto Rosecrans Street, a project on schedule for summer 2017 completion.
That’s what Naval Base Point Loma (NBPL) Capt. Howard Warner III told Peninsula residents at a June 22 public workshop on progress being made on repair and relocation of portions of its 17.3-mile pipeline running between NBPL and Marine Corps Air Station Miramar.
The original 17.3-mile pipeline, built in 1954 with a 30-year designed life, provides fuel for Navy ships and aircraft.?
Work on relocating 3.5 miles of pipeline from the La Playa area to Lytton Street to Rosecrans Street right-of-way, with segments along Talbot, Scott and Keats streets, began in February 2016.
Noting the pipeline is “the main artery of diesel fuel transportation for our ships an aircraft,” Warner added, “It’s our only West Coast refueling station.”
Warner, who assumed command of NBPL in August 2014, said the project includes installation of five new isolation valves to “mitigate leakage in the event of a seismic event causing a rupture in the pipeline.”
A one-mile section of the existing pipeline at the San Diego River crossing is also being relocated.
Concerning ongoing pipeline construction, Warner noted “safety is our number one priority.”
The NBPL commander strongly cautioned the public against entering the construction zone while pledging to “minimize the impact to our community and businesses. We have been diligent to ensure you have access to and from your homes and places of business.”
Warner noted pipeline construction progresses about 120 linear feet per day – more than 9,000 feet (nearly two miles) to date have been laid.
“We’re maintaining two-way traffic flow and will be conducting night work at the six main intersections to minimize impacts on traffic and the community,” Warner added.
The Naval base commander said hangars will be placed on doors in residential neighborhoods five days in advance of pipeline construction work.
The Navy is removing 1,175 feet of pipeline in the section along the La Playa Bayside Trail before restoring it. Restoration work will stabilize the trail’s previously eroded slope and revegetate with non-invasive, native plants. Trail users and those near it should expect noise and temporary closure of portions of the trail during construction.
For project inquiries call toll-free at 844-409-9846, email [email protected] or visit www.cnic.navy,mil/NBPLMiramarPipeline for more information. 

Publicación anterior

Point Loma Summer Concerts presenta los favoritos de la multitud

Publicación siguiente

Aprendiendo lecciones de vida y amor en una misión médica en Haití

Tech

tecnología

Relacionados Publicaciones

A red wood gavel
Noticias

Avanza el juicio por asesinato por apuñalamiento en North Park

por Neal Putnam
7 de mayo de 2023
sdsu housing
Noticias de Mission Valley - Noticias

Seleccionan desarrollador para el primer proyecto de vivienda asequible en SDSU Mission Valley

por Personal de SDNEWS
12 de abril de 2023
balboapark
Noticias del centro

Noticias breves de abril de San Diego y sus alrededores

por Personal de SDNEWS
11 de abril de 2023
Navy pipeline project progressing to completion in 2017
Noticias del centro

Ayuntamiento: El mayor propietario de viviendas de Estados Unidos aumenta el alquiler y desaloja a los inquilinos en SD

por Juri Kim
10 de abril de 2023
Navy pipeline project progressing to completion in 2017
Noticias del centro

Se lanza campaña de seguridad vial con carteles en intersecciones donde fallecieron personas

por Juri Kim
7 de abril de 2023
Navy pipeline project progressing to completion in 2017
Noticias del centro

El capítulo local de “Banking on Our Future” protesta contra los vínculos de los grandes bancos con los combustibles fósiles.

por Juri Kim
5 de abril de 2023
Navy pipeline project progressing to completion in 2017
Noticias

Nacen dos raros leopardos del Amur en un zoológico

por Personal de SDNEWS
28 de marzo de 2023
Navy pipeline project progressing to completion in 2017
Noticias

Los grupos de planificación comunitaria ahora deben reunirse en persona

por Dave Schwab
8 de marzo de 2023
Publicación siguiente
Navy pipeline project progressing to completion in 2017

Aprendiendo lecciones de vida y amor en una misión médica en Haití

[bloque de inserción = "1"]
  • Directorio de negocios
  • Sobre nosotros
  • Contáctenos
  • Escritores del personal
  • Suscripciones/Soporte
  • Publicaciones
  • Informe de noticias

CONECTAR + COMPARTIR

© Derechos de autor 2023 SDNews.com Política de privacidad

¡Bienvenido de nuevo!

Inicie sesión en su cuenta a continuación

¿Contraseña olvidada?

Recupera tu contraseña

Ingrese su nombre de usuario o dirección de correo electrónico para restablecer su contraseña.

Iniciar sesión
Sin resultados
Ver todos los resultados
  • en_US
  • es_MX
  • Informe de noticias

© Derechos de autor 2023 SDNews.com Política de privacidad